Main Contractor: BES
End User: Fujifilm
Working for a leading Biopharmaceutical CDMO (Contract Development & Manufacturing Organisation) we successfully completed the remodeling of an existing space into a classified ISO7 & ISO8 production facility.
The client needed a flexible design solution to allow the space to be reconfigured quickly to suit potential changing needs in the fast moving highly regulated industry.
The cleanroom was constructed using a fully demountable partitioning system to enable flush fitting and integration of services. A steel mezzanine was formed to create plant space.
Pharmaceuticals
AstraZeneca Macclesfield Campus
cGMP Grade D Packing Cells
Pharmaceuticals
Blue Chip Client
Quality Assurance Laboratory at the Manufacturing Facility
Pharmaceuticals
Pharmaceutical Manufacturing
Washing facility for pharmaceutical manufacturing and laboratory equipment
Stay up to date with industry insights and get inspired with innovative products and projects delivered to your inbox.
To get in touch with one of our experienced consultants, please fill out the short form below and we’ll be in touch with you as soon as possible.
0161 696 5100