Main Contractor: TCi construction WORKS
End User: Pharmaceutical Manufacturer
Working closely with the main contractor, TCi construction WORKS, we manufactured and supplied ceilings, door sets, walls and vision panels to create a new wash bay, hygiene room and several environmentally-controlled clean equipment storage rooms within an existing wet manufacturing area.
The layout features segregated zones for dirty and clean equipment, controlled by positive pressure, surrounding an installation of state-of-the-art, high-pressure washing units. The entire, 565m2 facility is finished to accommodate “wet” operation with high-grade Altro Quartz resin flooring, 1100m2 Norwood antibacterial grade sterile wall covering systems, Norwood antibacterial grade clip in ceiling system with integrated, radiused transitions throughout to aid cleanability. Our Hygiene Wall Panelling System and Hygiene Partition system helped TCi to provide considerable cost savings. The project was successfully delivered despite COVID-19 lockdown interruptions.
Pharmaceuticals
AstraZeneca Macclesfield Campus
The Global Packing Centre, GMP Grade D Packing Cells,
Pharmaceuticals
Blue Chip Client
Quality Assurance Laboratory at the Manufacturing Facility
Pharmaceuticals
Blue Chip Client
Process Rooms at the High Hazard Tablet Facility
Stay up to date with industry insights and get inspired with innovative products and projects delivered to your inbox.
To get in touch with one of our experienced consultants, please fill out the short form below and we’ll be in touch with you as soon as possible.
0161 696 5100