Main Contractor: BES
End User: Blue Chip Client
High Hazard Tablet Facility encompassing Granulation, Milling, Fluid Bed Drying and Compression Suites. The aesthetic and architectural element comprised of the supply and installation of the Norwood’s mediline system, walk on ceilings and electrically operated sliding doors to the process rooms.
HVAC was complex due to the large volume of ductwork within a tight ceiling space. To conquer this issue, we created a plenum that created a vacuum to suck the air out of the bottom section of the panel and push up through a duct within the panel void and redistributed through the vents within our ceiling panels.
In consultation with the cleanroom designers BES, Norwood produced special panels to complement the building restrictions whilst providing functional solutions to services contained in the walls and ceilings. This also necessitated Norwood designing and manufacturing a unique suspended services pedestal to allow flexibility within the constraints of the cleanroom.
Pharmaceuticals
AstraZeneca Macclesfield Campus
GMP Grade D Packing Cells,
Pharmaceuticals
Blue Chip Client
Quality Assurance Laboratory at the Manufacturing Facility
Pharmaceuticals
Fujifilm
ISO7 and ISO8 Cleanrooms at the Biotech Facility